- Group
- Markets
- Brands
- Expertises
- R&D
- Case Study
Musthane is involved in the Airport and Aviaition industry for many years and has developed very unique and inovative solutions in order to participate in the aircraft recovery operations.
Musthane has a unique position of Designer and Manufacturer of its equipment thanks to its large industrial and manufacturing capabilities throughout Europe.
Our offer is presented through MARS® which stands for Mobile Aircraft Recovery Solutions. This offer gathers most of the necessary equipment and services (training or technical assistance for use or maintenance) for the aircraft recovery: aircraft recovery lifting bags, aircraft recovery tow mats or temporary road, tethering equipment, sludge, turn-table...
MARS® aircraft recovery bags are a mobile equipment for the recovery of aircraft. Our solution consists in the rapid deployment of the necessary assets to lift a wide range of aircraft (A380¹, Mirage, F18, A320, B747…).
The lifting capacity of standard MARS aircraft lifting bags ranges from 15 tons to 60 tons per module. Each module is comprised of 3 inflatable cushions of 20 cm width. Modules are stackable to make a pile at the appropriate height.
The Top module is compartmented and designed in order to fit the aircraft body.
The inflation pressure of the lifting bags is up to 0.5 bar (7 PSI).
This range of recovery bags comes with a full packaged product such as recovery mats an flexible roadway, tethering equipment, aircraft towing system and turntable, sledge…
Aircraft recovery lifting bags advantages
- Only the top module must be adapted to the aircraft.
- The lifting bag is vulcanised in one piece in autoclave and homogeneously (no seam, no glue).
- The rubber coating type is manufactured on demand (Nitrile, Neopren…).
- One point of contact : the manufacturer is your direct contact.
- MARS offers also : aircraft defuellers, fuel bladders, lifting bags control panel, trailer...A simple system, easily used for partial or total lifting.
- A rapid deflation/inflation system allows a quicker operation.
- Training centre in France (2 sessions are organised per year)*by Professional Aircraft Maintenance Instructors.
- Equipment maintenance contract : we ensure that your equipment will work the day you need it.
- Recovery assistance : we are present in less than 24 hours to assist you *.
*Offer submitted to conditions.
